File #: BID 24-009    Version: 1 Name:
Type: Bids Status: Agenda Ready
File created: 8/22/2024 In control: City Council
On agenda: 9/3/2024 Final action:
Title: Awarding of the Deer Park Terrace Subdivision Street Reconstruction Project.
Attachments: 1. SPI - Recommendation of Award
Date Ver.Action ByActionResultAction DetailsMeeting DetailsAudio
No records to display.

Title

Awarding of the Deer Park Terrace Subdivision Street Reconstruction Project.

 

Body

Summary: 

On February 1, 2021 the City entered into a professional service contract with Schaumberg and Polk, Inc. (SPI) for the design of streets, drainage and utilities in the Deer Park Terrace Subdivision which include Linda, Robin, Irene, Maxie and west 3rd Street.  The streets within the project limits are relatively flat with little to no underground internal drainage. All of Robin, Irene and Linda Streets sheet flow south/southeast down the street to a single outfall pipe at the southeast corner of Irene Street.  The outfall pipe ties into a storm sewer manhole on Avon Street. 

SPI was tasked with designing the streets to drain the subdivision while navigating through existing underground utilities and around numerous trees adjacent to and encroaching onto the existing roadway surface.  After weeks of site visits the consultant developed and presented four scenarios to staff for consideration.  After a thorough internal review and lengthy discussion with the consultant, staff decided on the plan that provides for adequate roadway slope to drain all the streets and underground storm sewer piping (Alternative 1A).  As design progresses a tree protection plan will be developed by an arborist who has contracted with SPI.  

This project was advertised publicly and we received bids on August 22, 2024.  The proposal included an alternate bid to install new street lighting as well. 

We received the following 7 bids:

Bidder

Base Bid

Alternate Bid

Total Bid

Environmental Allies

$6,249,054.00

$99,635.00

6,348,689.00

D&W Contractors

$6,289,972.00

$104,100.00

6,394,072.00

Precise Services, Inc.

$6,868,575.80

$122,302.50

6,990,878.30

Specialty Construction TX

$6,964,386.00

$133,557.50

7,097,943.50

Conrad Construction Co.

$7,280,511.78

$105,300.00

7,385,811.78

iCON GC

$7,305,204.15

$119,794.85

7,425,179.00

Mar-Con Services

$7,449,548.86

$128,553.00

7,578,101.86

SPI has reviewed the proposals and qualifications and are recommending the project be awarded to Environmental Allies, based on their total bid of $6,348,689.00, which includes the alternate.  Attached you will find their letter of recommendation as well as the bid tabulation.

 

Fiscal/Budgetary Impact: 

Funding for this project is encumbered as follows:

$3,408,537 out of 2021 GO Street Bond fund & $1,305,626 out of the 2022 GO Street Bond fund

$1,634,526 out of 2021 GO Drainage Bond fund

 

Recommended Action

Award the bid for the Deer Park Terrace Subdivision Street Reconstruction Project to Environmental Allies.