Title
Consideration of and action on an agreement with Cobb-Fendley for design work for drainage section G105-04-01 Channel.
Body
Summary:
Channel G105-04-01 is the drainage easement on W. 13th next to new Fire Station 1 that flows to Georgia along the Battleground Golf Course ponds. The drainage ditch has become overgrown and drainage has been impeded due to vegetation and grading issues. The scope of work includes bank stabilization, ditch regrading, outfall repair and replacement, erosion control and maintenance access. The services include design and bid services, and supplying an opinion of probable construction costs.
Fiscal/Budgetary Impact:
Total cost for Cobb-Fendley’s scope of services as it pertains to this agreement would be $144,973.70. A cost breakdown is included below.
Design Phase - $98,228.00
Bid Phase - $6,930.00
Topography Survey - $16,985.00
Geo Tech - $20,830.70
Reimbursables - $2,000.00
There are available drainage bond funds to be utilized for this project.
Recommended action
Approve an agreement with Cobb-Fendley to design and provide professional engineering services for G105-04-01 channel for the amount of $144,973.70.