File #: DIS 18-158    Version: 1 Name:
Type: Discussion Status: Agenda Ready
File created: 10/31/2018 In control: City Council Workshop
On agenda: 12/4/2018 Final action:
Title: Discussion of issues relating to capital improvement projects at the Surface Water Treatment Plant.
Sponsors: Public Works
Attachments: 1. DEER PARK WTP CIP IMPROVEMENTS
Requester: Public Works
Date Ver.Action ByActionResultAction DetailsMeeting DetailsAudio
No records to display.
Title
Discussion of issues relating to capital improvement projects at the Surface Water Treatment Plant.
Body
Summary:
There are three (3) large scale projects that are needed at the surface water treatment plant. This presentation is an overview of the three projects and why each is needed. Two of these projects have a portion for consideration and action during the regular Council Meeting.
Project 1 is methods of solids handling at the Surface Water Treatment Plant. Currently, three (3) lagoons exist in the back of the plant that receive the sludge from the clarifiers. These lagoons were designed to allow water to return to the headworks of the plant so that water could be retreated and reused. The lagoons need to be cleaned out regularly, but that has not occurred. Currently, the lagoons are maxed out and we have run out of places to put the sludge. In approximately 2012, the middle lagoon was cleaned out with the material put into the northern most lagoon. In 2016-2017, the middle lagoon was partially cleaned out again because the plant was starting to return sludge to the headworks. The 2016-2017 project cost was $603,022.03. We estimate that less than half of the wet lagoon was cleaned at this cost. In 2017-2018, Ardurra Group, LLC was hired to conduct a study to compare 4 methods of sludge handling. Based on that report, one method was ruled as incompatible with our sludge and financial impacts were developed for the other three methods. Our proposal is to pursue the third alternative of using roll-off container, gravity dewatering system with additional structures needed for the efficient dewatering of sludge. The sludge would then be hauled offsite for disposal at a landfill. This project will be considered in the regular meeting to enter into an agreement with Ardurra Group LLC to begin the Engineering phase of the project.
Project 2 is a change to the existing clearwell. The clearwell is sized incorrectly for the requirements of the...

Click here for full text