Title
Consideration of and action on an ordinance amending Ordinance No. 3648 granting a pipeline franchise to NuStar Logistics for a twelve-inch (12”) Propane Pipeline. (Second reading)
Body
Summary:
In 2014, NuStar Logistics was granted approval to build a 12” propane pipeline. NuStar would like to modify the contents of the pipeline to refined petroleum products (See Attachment). The request to modify the pipeline has been reviewed by Engineering Coordinator Fred Beck who has reviewed the contents with the Fire Marshal.
The process for granting a pipeline franchise requires the reading of the proposed ordinance at three meetings with the final reading being no less than forty-two (42) days after the first reading. The ordinance will be read on the January 5th, January 19th with adoption on February 16th.
Fiscal/Budgetary Impact:
None
Recommended action
Amend ordinance