Title
Acceptance and release of retainage for the Emergency Sewer Failure on Downing Circle/Pasadena Blvd. Intersection project.
Body
Summary:
Acceptance and release of retainage for the Emergency Sewer Failure on Downing Circle/Pasadena Blvd. Intersection project. The project consisted of excavating the failed pavement, broken waterline, and storm sewer pipe. During excavation it was found that only a temporary fix could be done due to the depth of the pipe and the poor soil conditions. A separate contract for the final repair was done under another contractor.
The services of SKE Construction LLC was awarded through the Buy Board totaling $146,721.68. The repair cost total was $100,070.81. The retainage release for this project is $10,070.78. The project has been completed and is ready for Council acceptance.
Fiscal/Budgetary Impact:
This project was funded through the Water/Sewer Contingency Fund ($62,836.87) and CIP Contingency ($37,870.94).
Recommended action
Staff is recommending that council accept completion of the project.