Title
Consideration of and action on authorization to purchase a Genetec Surveillance and Access Control System from DATAVOX under DIR contract DIR-CPO-4766.
Body
Summary:
As identified in the updated 2020 5-year Strategic Technology Master Plan (STMP), this city surveillance and access control upgrade phase will provide the initial citywide framework for upgrading to Genetec Synergis and Omnicast systems. This is the third phase of the Genetec Surveillance and Access Control Migration, providing a much-needed upgrade to an aging platform with little stability and limited support. Phase III will focus on Court Theatre Building (located at 1302 Center St.), Wastewater Treatment Plant (located at 515 E 2nd St.), & Surface Water Treatment Plant (located at 2117 E. X St.). Total cost of this upgrade is $ 66,454.92.
Advantages of the new systems include a seamless, integrated approach to access control and surveillance compared to the existing separate component system. Also, information collection and storage will be in one location, simplifying investigations and providing an in-depth view of each event. In addition, access will further be streamlined into a single sign-on using Microsoft Windows Active Directory. Lastly, the new system allows the city to utilize multiple vendors for support resulting in faster service times while lowering costs.
Fiscal/Budgetary Impact:
Budgeted in FY 2023-2024 in the following accounts:
010-200-42790, Software - Other - IT Services, $26,535.80 (Software)
010-200-49040, Machinery & Equipment - IT Services, $51,755.00 (Hardware)
Recommended action
Authorize purchasing a Genetec Surveillance and Access Control System for the Court Theatre Building, Wastewater Treatment Plant, & Surface Water Treatment Plant under DIR contract DIR-CPO-4766 for the amount of $ 66,454.92.